Over the past few weeks, the demo and site work packages have been going full speed at the Sac State WELL building. I'll do a more detailed write-up later, but the short version is that the building will be expanded on two sides (the loading dock side and the University's Health Center side). The pix below are sure to be the first in many I will be posting over the next year. Demo and site work at the rear (loading dock) side of the building. Selective demo on the building envelop on the Student Health Center side or the building. This side will be extended outward. Replacing some concrete. This area will be receiving a new stairway to improve egress.
0 Comments
Leave a Reply. |
Archives
November 2022
Categories |