CM 10 is a fun class because for many of you it is the first glimpse into a rewarding career. However, since many students are new to construction, a lot of terms used by guest lecturers are unknown to the audience. I will try to catalog those terms here as an easy and ever-growing reference. ORGANIZATIONS Owners: like their name implies, owners "own" the structure that architects design and constructors build. Owners come in so many different varieties that defining them adequately and in detail would require a lot more than a simple blog post. To simplify things, I'll just provide some examples of owners:
PEOPLE AND POSITIONS Since this is a construction management class, I'm going to focus on the people who work on the constructor side of things (that is, we will not discuss the specific people involved in being owners or designers). In most cases, these people/positions exist with general contractors and subcontractors. I will further define these roles by "field" and "office". Field staff tend to spend most, if not all, of their time on the project site. Office staff tend to spend a lot of their time at the company's main or regional offices, although they do spend plenty of time on project sites. While some of these terms contain the term "man or men" in them, many women successfully hold those positions. Field staff:
Office staff:
DELIVERY METHODS While it is early in the term, we've already heard our guest speakers mention design-bid-build and design-build so I will briefly describe them below. In summary, the delivery method defines the relationship between the owner, architect and GC and how they will be organized. If these terms do not make complete sense by the end of CM 10, don't sweat it--they will be discussed in great detail throughout several future CM classes. The descriptions below come from a graduate-level class I teach, so it is a fairly advanced description of the delivery methods presented. Design-bid-build: In D-B-B, the owner has a separate contract with the designer and GC. The designer designs the project in total and then gives the plans to the owner. The owner then provides the plans to GCs who, in turn, create bids for the work that state how much each GC thinks the project will cost and how long the project will take. The owner selects the best bid and awards the project to the selected GC who then builds the project. Design-bid-build is the most traditional delivery method.
Design-build: In D-B, the owner has a single contract with a design-build team that is usually a joint venture between an architect and GC. The key is that the owner is dealing with a single team responsible for both designing and building the structure. Design-Build is considered and alternative delivery method.
There are other delivery methods that D-B-B and D-B, but this is a good starter for CM 10 for now. SPECIFIC TAKEAWAYS FROM SPEAKERS Heman Chand:
0 Comments
|
JRegI teach people who will be building our country's infrastructure. Archives